Master GC Partnership — Fee Calculator

Run your own
numbers.

Two parts. A monthly rate that holds your territory, plus a per-project build fee charged at contract. The build fee depends on what you are building. Forty territories in New England, about 100,000 ADU-potential parcels behind each one.

Territory tier

Tier is set by territory, not by negotiation. Check the territory map for yours.

Project type

A new detached ADU or new accessory structure.

Signed contract price
$

The construction contract, excluding homeowner-supplied materials and permit fees the homeowner pays directly.

Detached builds already contracted this year

Detached volume only. Conversions do not count toward the step-down.

Build fee on this project
$5,950
Charged at contract, only on a project the Ecosystem originates.
Monthly territory rate$549
Twelve months of territory$6,588
Build fee on this project$5,950
Contract less the build fee
Build fee as a share of contract
Apply for Your Territory
Illustrative only. A build fee applies solely to a project The ADU Exchange originates, and only at contract signing. Nothing is charged on work you source yourself. If a detached structure is any part of the scope, the project is treated as detached. Detached volume bands are counted on Ecosystem-originated detached projects contracted in the trailing twelve months. All commercial terms are set in the Master GC membership agreement, which controls in the event of any conflict with this page.
Part 1

Monthly territory rate

$499, $549 or $599, set by territory tier. It holds your territory whether or not a project lands that month.

Part 2A

Detached build fee

A set fee per detached build, $4,950 to $6,950 by tier, stepping down at 6+ and 11+ builds a year.

Part 2B

Conversion build fee

3% of the signed contract, $2,000 minimum and $4,500 maximum. Basement, attached or in-law, existing garage, above-garage, attic. The cap keeps a conversion cheaper than a new detached build, always.