Run your own
numbers.
Two parts. A monthly rate that holds your territory, plus a per-project build fee charged at contract. The build fee depends on what you are building. Forty territories in New England, about 100,000 ADU-potential parcels behind each one.
Tier is set by territory, not by negotiation. Check the territory map for yours.
Project typeA new detached ADU or new accessory structure.
The construction contract, excluding homeowner-supplied materials and permit fees the homeowner pays directly.
Detached volume only. Conversions do not count toward the step-down.
Monthly territory rate
$499, $549 or $599, set by territory tier. It holds your territory whether or not a project lands that month.
Detached build fee
A set fee per detached build, $4,950 to $6,950 by tier, stepping down at 6+ and 11+ builds a year.
Conversion build fee
3% of the signed contract, $2,000 minimum and $4,500 maximum. Basement, attached or in-law, existing garage, above-garage, attic. The cap keeps a conversion cheaper than a new detached build, always.